Status
Under construction · about 20% built
The secretariat lit at night
The secretariat lit at night

Project stages

Ola Magdy · Design lead, under Sourabh Gupta’s guidance

  1. 01Concept & master plan
  2. 02Design development
  3. 03DPR
  4. 04GFC
  5. 05Construction
  6. 06Completion

Under construction · about 20% built

Status as documented in the supplied project portfolio.

01 / Additional Secretariat

Nature over man

A floating cloud, the synonym of Meghalaya, inspired the form. A wide roof protects the commons, and a colonnade of 24 columns stands for the 24 assembly segments of Tura.

The building is under construction, about 20% complete.

Cloud, roof and colonnade
Cloud, roof and colonnade
Design concept
Design concept

02 / Additional Secretariat

A public institution in the landscape

Site plan
Site plan

Elliptical blocks under floating roofs
24 columns for 24 assembly segments
Lake, lawn and public plaza

Ground floor plan
Ground floor plan

03 / Additional Secretariat

From render to construction

Construction photograph: foundations
Construction photograph: foundations
Construction photograph: columns
Construction photograph: columns
Cafeteria design visualisation
Cafeteria design visualisation
Lobby design visualisation
Lobby design visualisation
Interior design visualisation
Interior design visualisation

04 / Additional Secretariat

Plans, sections and details

Aerial view
Aerial view
First floor plan
First floor plan
Section
Section
Typical plans
Typical plans
The convention centre in its forest setting

Continue exploring

Tura Convention Centre

View project ↗
Ola Magdy / Archohm

Design lead under Sourabh Gupta’s guidance. Project credit: Archohm. Visualisations, drawings and construction photographs as supplied in the portfolio.

Open original image ↗