← All projects

Housing and mixed use / New Shillong, Meghalaya

Prime Hub

Client
Government of Meghalaya
Location
New Shillong, Meghalaya
Status
Under construction · 40%
The hub on the hill at dusk
The hub on the hill at dusk

Project stages

Ola Magdy · Design lead, under Sourabh Gupta’s guidance

  1. 01Concept & master plan
  2. 02Design development
  3. 03DPR
  4. 04GFC
  5. 05Construction
  6. 06Completion

Under construction · 40%

Status as documented in the supplied project portfolio.

01 / Prime Hub

An incubation hub for young people

An incubation hub for young people in New Shillong. Incubators, a fab lab, a library, an auditorium and a café sit along a stepped amphitheatre, with a roof plaza and a watch deck over the hills.

The project is under construction, about 40% complete.

The stepped amphitheatre
The stepped amphitheatre
The hub at night
The hub at night

02 / Prime Hub

Site and floor plans

Site plan
Site plan
Ground floor plan
Ground floor plan

04 / Prime Hub

Plans, sections and details

Ground floor plan
Ground floor plan
First floor plan
First floor plan
Roof plan
Roof plan
Section through the hill
Section through the hill
The terminal and its tower at dusk

Continue exploring

Bus Depot New Shillong

View project ↗
Ola Magdy / Archohm

Design lead under Sourabh Gupta’s guidance. Project credit: Archohm. Visualisations, drawings and construction photographs as supplied in the portfolio.